1l mapp and propane gas cylinder for welding, deicing, heating - BRIC

1.1l mapp and propane gas cylinder for welding,deicing or heating., 2. reach 1300C in 25 seconds., 3. standard:EN12205:2001 - details see: https://www.packinghere.com/1l-mapp-and-propane-gas-cylinder-for-welding-deicing-heating-10053181
Material: SteelUse: Industrial GasPressure: LowPlace of Origin: Tianjin China (Mainland)
Brand Name: talentsModel Number: BRICStandard: EN12205:2001particular purpose:: non-refillable transportable gas cylinder
content:: propane allylene propylene butaneusage:: welding,deicing or heatinghighest temperature: 1300C in 25 seconds 
1l mapp and propane gas cylinder for welding, deicing, heating BRIC
contact supplier for 1l mapp and propane gas cylinder for welding, deicing, heating BRIC


1.1l mapp and propane gas cylinder for welding,deicing or heating.
2. reach 1300C in 25 seconds.
3. standard:EN12205:2001

4.. to be used with a torch to burn mapp,propane or mixed gas for welding, deicing and heating

(1) MAPP Pro physical property:
MAP//Pro gas cylinder for the professional actual burning temperature: approach to 3600°F
Scientific blend proportion and good flame to guarantee good welding result and shorten working time.
Gas valve has CGA 600 connection
Conforms to EN 12205.

(2) MAP//Pro package and storage:
Available in disposable steel cylinder (Size: φ75×280mm; Net Weight: 16oz). The standard packages are as

follow: 12 cylinders per carton; 17004 cylinders per 20ft container.

Standard: EN12205:2001

Height: 273mm

Inner diameter: 72.40

Working pressure: 12 bar

Testing pressure: 28 bar

Volume: 1 litr.

Working temperature: 30 to 65C

(3)Testing Report

  1. welding torch: EH-1S
  2. indoor temperature when testing: 19°C
  3. the range of the temperature measurer: up to 1300°C
  4. testing record:

Testing one:

EH-1S

time to reach 1100°C16 seconds
time to reach 1200°C25 seconds
time to reach highest temperature1263°C58 seconds

Testing two:

EH-1S

Time to reach 1100°C14 seconds
Time to reach 1200°C23 seconds
time to reach highest temperature1285°C48 seconds

Packaging Detail:12 pieces to be packed in a box and 6 boxes in a carton, one 20" conatiner can load 17000 pieces
Delivery Detail:10 days after receiving 30% prepaid of the invoice value

Related Product for 1l mapp and propane gas cylinder for welding, deicing, heating