BOPP Metalized Film - GETTEL BOPP-001
BOPP Excellent gloss, stiffness, metal adhesion, dimensional stability, Low static,excellent flatness, good heat seal stregth. - details see: https://www.packinghere.com/bopp-metalized-film-10027925
Material: BOPP | Type: Metallized Film | Usage: Packaging Film | Feature: Moisture Proof |
Hardness: Soft | Processing Type: Multiple Extrusion | Transparency: Opaque | Place of Origin: Zhejiang China (Mainland) |
Brand Name: GETTEL BOPP FILM | Model Number: GETTEL BOPP-001 |
BOPP Metalized Application:
Widely used in food & confectionary packaging like
Potato chips, coffee, snacks ,cookie packaging etc.
Features:
One side metallized for printing and lamination, another side heat sealable
One side corona treatment, normal sealing temperature
Excellent gloss, stiffness, metal adhesion, dimensional stability
Low static, excellent flatness, good heat seal strength
Properties | Test Method | Unit | Typical value | ||||
Thickness | Gettel | μm | 18 | 20 | 25 | 30 | |
Thickness Variation | Astm-252-78 | % | ±3.0 | ±3.0 | ±2.5 | ±2.5 | |
Yield | Gettel | M2/kg | 61.1 | 55.0 | 44.0 | 36.6 | |
Optical Density | Gettel | % | 2.1 | 2.1 | 2.1 | 2.1 | |
Tensile strength | MD | Astm D-882 | Mpa | 140 | 140 | 140 | 140 |
TD | Astm D-882 | Mpa | 280 | 280 | 280 | 280 | |
Elongatin At Break | MD | Astm D-882 | % | 185 | 185 | 185 | 185 |
TD | Astm D-882 | % | 65 | 65 | 65 | 65 | |
C.O.F | FILM/FILM | Astm D-1894 | - | 0.4-0.6 | 0.4-0.6 | 0.4-0.6 | 0.4-0.6 |
Heat Shrinkage | MD | Astm D-1204 | % | 4.0 | 4.0 | 4.0 | 4.0 |
TD | Astm D-1204 | % | 2.0 | 2.0 | 2.0 | 2.0 | |
Sealing Strength | Gettel | N/15mm | 3.0 | 3.0 | 3.0 | 3.0 | |
Sealing Temperature | Gettel | °C | 125-135 | 125-135 | 125-135 | 125-135 | |
Wetting Tension | Astm D-2578 | Dyn | >=38 | >=38 | >=38 | >=38 | |
OTR(23°C,0%RH) | Astm D-3985 | Cm3/m2/24h | <=150 | <=150 | <=150 | <=150 | |
WVTR(38°C,90%RH) | Astm F-1249 | Gr/m2/24h | <=1 | <=1 | <=1 | <=1 |
Packaging Detail:BOPP metalized film, with foam and cardboard, 20 FCL. |
Delivery Detail:three weeks after receiving down payment or original L/C. |