latest vertical 20l jerry cans - SG6003
1.cold-rolled steel sheet, 2.portable carry, 3.pretty appearance, 4.rust-resistant and wear well - details see: https://www.packinghere.com/latest-vertical-20l-jerry-cans-10020386
Material: Metal | Metal Type: Stainless Steel | Use: Petrol | Place of Origin: China (Mainland) |
Brand Name: Sengong | Model Number: SG6003 | Capacity: 20L | Body Material: cold-rolled steel sheets |
Wall thickness: 0.6mm/0.8mm | Surface treatment: powder painting | Inner treatment: anti-rust | Application: for filling petrol/gasoline/diesel oil |
Certificate: UN | Color: Army green | OEM: yes |
Specification
latest vertical 20l jerry cans
Application: This tank is widely used for suburb camp, testing vehicles oil consumption, traveling
motorcade, automobile rescue, project construction
Body material: cold-rolled sheet, 0.6/0.8 mm thickness.
Features
This item is drawed and formed by cold rolled plate, through drying paint,
a. The barrel is used galvanized plate welded together, hard to deform and rust
b. Powder coating treatment on surface
c. Anti-rust treatment for outlet
d. Bayonet switch effectively guarantee seal
e. Electric resistance welding
Metal oil barrel process flow
Serial number | Nomenclature | Processing equipment |
1 | Blanking | Plate shears |
2 | Stretching and forming | Hydraulic press |
3 | Deburring | Puncher |
4 | Typing | Puncher |
5 | Flow nipple punching | Puncher |
6 | Edge curl | Edge former |
7 | Bottom side forming | Puncher |
8 | Around welding | Argon arc welding machine |
9 | Flow nipple welding | Argon ard welding machine |
10 | Pressure test | Air compressor |
11 | Carrying handle welding | Argon arc welding machine |
12 | Shaping and decontaminating | Ultrasonic wave cleaner |
13 | spray drying | Lacquering house Bake oven |
14 | Inspection and packing | Quality department |
15 | Final random inspection | Quality department |
Reality shot
Superior quality, reasonable price, continuous service and logistic system, welcome to contact us!
Packaging Detail:Master Carton: packed in a five-story corrugated carton Inner: Each wrapped in an opp bag |
Delivery Detail:30days after receiving your down payment |